x

Like our Facebook Page

   
Early Times Newspaper Jammu, Leading Newspaper Jammu
 
Breaking News :   After skipping his Choubarsi, Cong to observe death anniversary of Madan Lal Sharma | Amid chill, CM Omar stations himself in Kashmir to ensure relief | ‘South Indian cinema can promote J&K’s natural beauty’ | Income Tax Deptt serves notice to PDP MLA | Suspected TeM terrorist arrested in Bengal | Properties worth Rs 1.28 cr attached under NDPS Act | 3 held with arms in North Kashmir | CB produces challans against 18 accused | Trainee cop dies of bullet wound | Battling power cuts, Kashmiris fall back on Kangris | Annual Mahotsav 2024 showcases Swadeshi Spirit & Self-Reliance: Kavinder | Javed Rana inspects Gujjar Bakerwal hostel | Modi Govt builds on Vajpayee's legacy, strengthening India's global position: Rohiin Chandan | Trikuta Nagar Welfare Society Raises Alarm Over Rising Crime, Drug Abuse | DC Bandipora Inspects JKSSB Exam Centres, Reviews Arrangements | Keshav Chopra organises Free Health Check Up Camp | Congress to connect with roots, observe anniversaries of all top leaders | NDS Felicitates Eminent Artists at ‘Dogri Bhasha Mannata Dhiadda’ Celebration | Indian Army organised Mobile Medical Patrol | ADC Kupwara inspects JKSSB Examination Centres | PDP holds meeting in Habba Kadal zone deliberates upon several issues | Edu Deptt Hosts Debate & Painting Competition | Babu Rampaul reiterates demand for restoration of statehood to J&K | Absconder arrested after evading arrest for over a year | Crackdown on illegal mining; 5 vehicles seized: Reasi Police | Reasi Police launches verification drive of Sim vendors outlets | Bovine smuggling attempt foiled: 11 bovines rescued in Udhampur | Missing girl recovered, reunited with family in Kishtwar | DC Reviews JKSSB Examination Process | Freedom Society Sports, Martial Arts Championship Concludes | 578 Aspirants appear for JKSSB Examination | Free Multi-Speciality Health Checkup camp organized | KUT Judo Championship 2024 to be held in Jammu | JU organises workshop on “Research Methodology” | Equitable System | Back Issues  
 
news details
Banihal-Hingni stretch of USBRL project likely to be completed by June end
3/12/2023 10:23:19 PM

Early Times Report

JAMMU, Mar 12: Work on a 23-km stretch from Banihal to Hingni on the prestigious Udhampur-Srinagar-Baramulla Railway Line (USBRL) project in Jammu and Kashmir is likely to be completed by the end of June, an official said.
The USBRL project is aimed at providing seamless and hassle-free connectivity to Kashmir valley.
Out of the total 272-km USBRL project, 161 km was commissioned in phases with first phase of 118-km Qazigund-Baramulla section commissioned in October 2009 followed by 18-km Banihal-Qazigund in June 2013 and 25-km Udhampur-Katra in July 2014. According to Northern Railways, 93 percent work on the under-construction 111-km Banihal-Katra section has been completed. This sector has a total of 37 bridges and 35 tunnels with a length of 164 km.
Banihal-Hingni portion of the USBRL will be ready (for operations) by June 30. The work is going on round-the-clock to achieve the deadline, Project Manager, ABCI Infrastructure, Nadeem Shamas, said.
He said the sector passes through various tunnels and bridges and most of the work has been completed.
The 765 metre-long cut and cover tunnel near Krawa village is complete in all respects. T 78 tunnel is also almost complete with Ballastless Track (BLT) laying works expected to be completed by April end. The two-km T 77D tunnel, which merges with an old tunnel having over 2.5 km length, is going through lining works and is likely to be completed next month, he said.
He said after completion of the lining works, the BLT work is scheduled to be completed by May 30 and the tunnel will be handed over to Northern Railways.
The 272 km-long USBRL project was declared as a National Project in 2002 and is expected to be completed by the end of this year.
Of the 111-km, 53 km falls in Ramban district and 87 percent of this length is covered by tunnels. The highest railway tunnel in the country, T-49 is constructed in the district, Deputy Commissioner, Ramban, Mussarat Islam said.
The work on the 12.758 km long T-49 tunnel, connecting Khari Aarpinchla and Sumbar, was completed on February 15 last year, surpassing the Pir Panchal tunnel of 11.2 km length constructed by USBRL on the Banihal-Qazigund section.
Given the pace of work, we are confident that the USBRL will be completed in the set timeline. The district administration has given full support to the execution companies whether it is Northern Railways, IRCON or Konkan railway, Islam said.
He said sometimes there are labour related issues but the administration actively resolves them to ensure that the work is not hampered.
Additional Deputy Commissioner, Ramban, Harbans Lal, who is also collector (for the twin national projects being executed by railways and National Highway Authority of India) are getting regular feedback and keeping a close watch on the works, he said.
  Share This News with Your Friends on Social Network  
  Comment on this Story  
 
 
 
Early Times Android App
STOCK UPDATE
  
BSE Sensex
NSE Nifty
 
CRICKET UPDATE
 
 
 
 
 
 
 
 
   
Home About Us Top Stories Local News National News Sports News Opinion Editorial ET Cetra Advertise with Us ET E-paper
 
 
J&K RELATED WEBSITES
J&K Govt. Official website
Jammu Kashmir Tourism
JKTDC
Mata Vaishnodevi Shrine Board
Shri Amarnath Ji Shrine Board
Shri Shiv Khori Shrine Board
UTILITY
Train Enquiry
IRCTC
Matavaishnodevi
BSNL
Jammu Kashmir Bank
State Bank of India
PUBLIC INTEREST
Passport Department
Income Tax Department
JK CAMPA
JK GAD
IT Education
Web Site Design Services
EDUCATION
Jammu University
Jammu University Results
JKBOSE
Kashmir University
IGNOU Jammu Center
SMVDU