x

Like our Facebook Page

   
Early Times Newspaper Jammu, Leading Newspaper Jammu
 
Breaking News :   Will not send Dr Sahib empty-handed: Ruhullah reacts to Farooq’s resignation challenge | Kishtwar minor death case: NCST likely to step in, team may visit Chatroo soon | CM Omar calls for shared responsibility to shape future of J&K children | 1998 Wandhama Massacre: SIA re-opens investigation into killings of 23 KPs | Rape accused who escaped police custody arrested in Jammu | DGP Prabhat reviews security preparedness for Eid Milad, Raksha Bandhan | Recruitment rules obsolete, redundant, need urgent revision: JKPSC | Land records go digital, farmer services get smarter | The road to developed India begins in the classroom | Expensive Treatment, A Heavy Burden on Life | Step In A Right Direction | 184 Armed Police personnel granted in-Situ Promotion | Satish Sharma extends Eid-e-Milad-un-Nabi (SAW) greetings | Major Turning Point In India's Digital Payment Journey: PM Modi On 10 Years Of UPI | Court acquits brother-in-law, family in rape-dowry case; slams 'One-Sided, Perfunctory' probe | Govt to sell onions at Rs 35/Kg in Delhi; 1st 'Kanda Express' with 800 Tn supply to reach on Wed | Two suspected over ground workers of terrorists arrested in J&K | NHAI clarifies incident at package-15 of Delhi-Amritsar-Katra Expressway near Jakh, Samba | Annual Kousar Nag Yatra-2026 concludes with participation of over 800 devotees | H1N1 Rise: Children, Elderly People At Most Risk, Doctors Warn | Labourer crushed to death as bridge pier collapses in Jammu | "Women's empowerment is one of main priorities of Omar Abdullah-led Government: RL Gupta | Anil Gupta, Senior Vice President JCCI flags tariff hike, warns of industry closures and job losses | From Haridwar to Udhampur: Rakshan Sharma carries Ganga Water, spreads message to protect Devika | Er Kiran Wattal Conferred Lifetime Achievement Award at International Excellence Awards | Arvind Gupta reviews PHE Works, pushes comprehensive water security plan for Jammu west | MIER College organises guest lecture on ALIMCO scheme and Disability Welfare Benefits | DC Udhampur chairs DDMA meeting; reviews restoration works in rain affected areas | DC directs for civic improvements ahead of Eid-e-Milad-un-Nabi, Raksha Bandhan | District Zoonosis Committee meeting held | Indian Army conducted medical health camp at Himote, Doda | Workshop on Aquifer Mapping, Groundwater Management held at Kathua | Swachhata Sankalp campaign held in Bhaderwah | DDC reviews progress of JJM Schemes in Doda | Back Issues  
 
news details
From deficit to surplus: J&K eyes hydropower boost with mega projects
2/8/2026 11:00:52 PM
Early Times Report

Jammu, Feb 8: Jammu and Kashmir has an estimated hydropower potential of 18,000 MW, of which 14,867 MW has been identified so far. However, only 3,540.15 MW—around 23.81 per cent of the identified potential—has been harnessed to date, according to the Economic Survey Report 2025-26 tabled by Chief Minister Omar Abdullah on the floor of the Assembly. Of the total installed hydropower capacity, 1,197.40 MW falls under the State sector, 2,250 MW under the Central sector, and 92.75 MW has been developed through the Independent Power Producer (IPP) mode. At present, 31 hydropower projects are operational across the Union Territory.
The National Hydroelectric Power Corporation (NHPC) operates six projects with a combined capacity of 2,250 MW, while the Jammu and Kashmir Power Development Corporation (JKPDC) manages 13 projects with an installed capacity of 1,197.40 MW. Independent Power Producers, including JKSPDC and JAKEDA, operate 12 projects with a total capacity of 92.75 MW.
Up to November 2025, the government has established transmission and distribution infrastructure with a capacity of 34,839.06 MVA and an electric line network spanning 1,76,601.29 circuit kilometres. The transmission and distribution capacity has increased by 44 per cent since 2020, reflecting sustained investment in power infrastructure.
The government aims to ensure a reliable, safe, and affordable 24×7 power supply by optimising generation and strengthening transmission and distribution systems. Officials said the enhanced infrastructure will not only meet local demand but also enable the export of surplus power to generate additional revenue.
Jammu and Kashmir is also in the process of significantly expanding its hydropower capacity through four major projects with a combined capacity of 3,014 MW. These include the 1,000 MW Pakal Dul project, 850 MW Ratle-II Hydroelectric Project, 624 MW Kiru, and 540 MW Kwar. All four projects are
On the recommendation of the J&K government, the Ministry of New and Renewable Energy has approved a project to provide 200 free units of electricity per month to 2.21 lakh Antyodaya Anna Yojana (AAY) families under the PM Surya Ghar Muft Bijli Yojana.
expected to be completed by 2028, effectively doubling the Union Territory’s current hydropower generation capacity.
Electricity consumption in the region has risen steadily, with per capita consumption recording a compound annual growth rate (CAGR) of 2.15 per cent over the past nine years, increasing from 1,171 kWh to 1,488 kWh. Total electricity consumption during the same period grew from 15,225 million units to 20,830 million units, in line with rising demand.
As of November 2025, around 24.59 lakh electricity connections are being supplied power across various consumer categories in Jammu and Kashmir.
Progress has also been reported in the rollout of smart metering. Under the Prime Minister’s Development Package (PMDP), 6.46 lakh smart meters have been installed against a revised target of 6.86 lakh. Additionally, under the Revamped Distribution Sector Scheme (RDSS), 5.25 lakh smart meters have been installed against a target of 14.07 lakh as of January 14, 2026.
The renewable energy sector is gaining momentum, particularly in solar power and small hydropower projects. The Jammu and Kashmir Energy Development Agency (JAKEDA) has allotted 56 Mini Hydel Projects with an aggregate capacity of 147 MW under the IPP mode, of which seven projects with a cumulative capacity of 35.25 MW have been commissioned.
Under the PM Surya Ghar Bijli scheme, 7,125 government buildings have been solarised against a target of 22,494, while 16,799 households have been solarised against a target of 83,550. These initiatives have added 131 MW to the region’s renewable energy capacity.
Meanwhile, on the recommendation of the J&K government, the Ministry of New and Renewable Energy has approved a project to provide 200 free units of electricity per month to 2.21 lakh Antyodaya Anna Yojana (AAY) families under the PM Surya Ghar Muft Bijli Yojana through the Utility-Led Aggregation model. Implementation of the project is set to begin shortly.
  Share This News with Your Friends on Social Network  
  Comment on this Story  
 
 
 
Early Times Android App
STOCK UPDATE
 
 
 
 
 
 
 
   
Home About Us Top Stories Local News National News Sports News Opinion Editorial ET Cetra Advertise with Us ET E-paper
 
 
J&K RELATED WEBSITES
J&K Govt. Official website
Jammu Kashmir Tourism
JKTDC
Mata Vaishnodevi Shrine Board
Shri Amarnath Ji Shrine Board
Shri Shiv Khori Shrine Board
UTILITY
Train Enquiry
IRCTC
Matavaishnodevi
BSNL
Jammu Kashmir Bank
State Bank of India
PUBLIC INTEREST
Passport Department
Income Tax Department
JK CAMPA
JK GAD
IT Education
Web Site Design Services
EDUCATION
Jammu University
Jammu University Results
JKBOSE
Kashmir University
IGNOU Jammu Center
SMVDU