Early Times Report
JAMMU, Nov 2: Superintending Engineer (Distribution) JPDCL, O&M Circle Kathua has informed that to carry out the branch cutting of trees under the corridor of 66 KV Sarna-Kathua Line, the power supply to Keerian Local, Industry (Crushers), CNC Keerian and adjoining areas will remain affected on Nov 05 from 9 am to 2 pm. Similarly, to carry out the branch cutting of trees under the corridor of 66 KV Pathankot-Kathua Line, the shutdown of shutdown of 66 KV Pathankot-Kathua line is being observed. During the shutdown, the affected load shall be accommodated on Grid Station Kathua. Meanwhile, to execute reconductoring work with Dog/Rabbit and tapping of 11 KV new line in IPDS /PMDP Scheme, the power supply to Garib Basti, Lakhanpur Bazar, Goplden Gate, Mahabti, Kattal Chowk etc will remain affected on Nov 03, 05, 07, 09 from 9 am to 2 pm. However, for testing of CT/PT Units, the power supply to all Industry Units on 11 KV Industry-II, IGC-I Phase-I, Samba will remain affected on November 05 from 12 noon to 2 pm. Similarly, the power supply to all Industry Units on 11 KV Industry-V, IGC-I Phase-I, Samba will remain affected on November 05 from 1 pm to 4 pm. |