XEn, AEE, JE booked for executing substandard works | | | Early Times Report Jammu, Apr 10: Anti-Corruption Bureau Doda has registered a case under FIR No.03/2019 u/s 5(1)(d) r/w 5(2) Prevention of Corruption Act Svt. 2006 & sections 120-B RPC against Rajesh Gupta, the then Executive Engineer, Town Drainage Division, Jammu, Subash Chander, the then AEE, Town Drainage Division, Jammu, Kuldeep Kumar Koul, JE, Town Drainage Division, Jammu and contractor Mansoor R/o Thathri on the basis of a Joint Surprise Check (JSC) conducted into the allegations for use of substandard material in the construction of concrete bund at Kutan nallah Thathri, Distt. Doda and excess payment drawn for removing the debris accumulated in the said nallah due to flash flood in the month of July 2017. During the JSC, it had surfaced that the said construction work was executed by Executive Engineer, Town Drainage Division, Jammu for which a detailed estimate amounting to RS. 127 .00 Lakh including 21 lakh for its temporary restoration was submitted to Director, Urban Local Bodies, Jammu. The Director, Urban Local Bodies, Jammu released a sum of Rs 50.00 lacs and placed same at the disposal of Executive Engineer, Town Drainage Division, Jammu. The above said work was put to tender vide NIT No.07/PLAN of 2017-18 dated 20.09.2017 for estimated cost of Rs 7.01 lakhs for a length of only 12 mtrs work which was allotted to L-1 contractor namely Mansoor Ahmed R/O Thathri on negotiable amount of Rs 7,84,897.00 vide allotment No. TDD/J/998-1001 dated 06.10.2017. Thereafter another short notice tender was advertised vide e-NIT No.30/2017-18 dated 27.12. 2017 for estimated cost of Rs 28.72 lakh for a length of 48 mtr work which was allotted to the same contractor on negotiable amount of Rs 32, 23,073.00 vide allotment No.TDD/J/1828-31 dated 10.01.2018 by the Executive Engineer, Town Drainage Division, Jammu, being lowest tenderer. Two payment orders were released in favour of the contractor i.e Rs 7,16,549/- & Rs 26,43,550/- against the allotted works and after deducting the applicable taxes he received net amount of Rs 32,92,897/-. Rebound Hammer Test, which was conducted through experts of Material Testing Laboratory, Nagrota and the test report received from Executive Engineer, PWD (R&B) Const. Div No.II Jammu revealed that the material used was of sub-standard quality. The above named engineers the then posted in Town Drainage Division, Jammu by abuse & misuse of their official position & in league with contractor namely Mansoor Ahmed allowed execution of poor quality, substandard and under specification work at said nallah by inflecting a loss of Rs 32,92,897/- upon state exchequer as per the facts emerged so far. The investigation of the case has been taken-up. |
|